CLEAR LAKE ELEMENTARY
SPECS
37,000 s.f.
CONTRACTOR
P&C Construction (2014)
First Cascade Corporation (2011)
PHOTOGRAPHY
Anderson Shirley Architects
Clear Lake Elementary School was remodeled and upgraded as part of the Salem-Kezier Public School construction and renovation bond passed in 2008. In 2014 we implemented the following renovations at Clear Lake:
-Flooring Replacement
-Repair and renovation of existing HVAC system
-Extended existing loading dock
In 2011 the following improvements were made to Clear Lake:
-Painting and sealing the entire exterior
-Re-caulking existing windows